ACEREZ, a partnership of ACCIONA, COBRA and Endeavour Energy, has been appointed network operator by EnergyCo to design, build, finance, operate and maintain the Central-West Orana Renewable Energy Zone (REZ) transmission network.
The ACCIONA COBRA Joint Venture (ACJV), the design and construct (D&C) consortium, will design and build the Central-West Orana REZ transmission project.
The Central-West Orana Renewable Energy Zone (REZ) Transmission Project will build new high-capacity transmission lines, energy hubs and supporting infrastructure to transfer power generated by solar and wind projects to electricity consumers. The new infrastructure is expected to be operational by 2028 and will initially unlock up to 4.5 gigawatts of new network capacity.
CWO project consists of 90km of 500kV overhead transmission lines and 150 km of 330kV transmission lines for generator connections, stretching from Elong Elong in the west through to Barigan Creek in the east, via an energy hub at Merotherie.
The Central-West Orana project is currently seeking dedicated Project Engineer – Electrical to share their expertise within our growing Energy Hubs and Substations Teams