ACEREZ, a partnership of ACCIONA, COBRA and Endeavour Energy, has been appointed network operator by EnergyCo to design, build, finance, operate and maintain the Central-West Orana Renewable Energy Zone (REZ) transmission network. The ACCIONA COBRA Joint Venture (ACJV), the design and construct (D&C) consortium, will design and build the Central-West Orana REZ transmission project.
The new transmission network infrastructure will deliver at least 4.5 gigawatts of new network capacity from 2028 to connect 7.7 gigawatts of wind and solar projects, which is enough to power more than 2 million homes each year.
Our Central-West Orana Project is currently seeking an experienced Storeperson to join our growing project team.
Working within the project logistics and warehouse function, you will be responsible for the efficient receipt, storage, tracking, control and distribution of materials, equipment and inventory required to support construction activities across the project.
The successful candidate will have strong experience working in a busy warehouse or logistics environment, with demonstrated knowledge of materials management, inventory control and warehouse management systems. You will play a key role in ensuring materials are accurately received, recorded, stored and issued to site teams when required.
This is a remote project position operating on a 14 days on / 7 days off roster. Bus transport is currently provided from Sydney only, with various pick-up and drop-off stops between Sydney and the Mudgee region. All other applicants within NSW will be required to DIDO (Drive In Drive Out) at their own expense. Please note this is not a FIFO role, and candidates residing outside NSW will be required to arrange and fund their own travel to Sydney or site if successful.