The main responsibilities include:
•
Approves MOD Close to KNOWN (CTK) MP intent (Specific Design)
● Close engineering task for CTK MODs (MOD closure support) - (Specific Design) -
● Complete and validate Service Bulletin Concurrent Requirements (SBCR) on Service Bulletin (SB) revision
● Define the detailed planning to reach the Airline Target date in accordance with Solution Embodiment Kick Of Meeing (SEKOM) conclusions
● Request adaptation drawings
● Define pre/post drawing solutions for defined Manufacturer Serial Number (MSN) effectivity (Engineering configuration analysis - drawings vs MSN)
● Perform Drawing approval
●Identify Long Lead Item(s) (LLI) and all pre post Part Number (PN)
● Finalize and validate the SB Preparation Dossier (including SBCR, Concurrent
requirement, Engineering Configuration definition)
● Organize the Handover meeting with the SB Author when the SB Preparation Dossier
● Support in the technical scrutiny of the SB