This role manages the team responsible for ERCOT’s Large Load planning and Batch studies, developing transmission system upgrade projects ranging from $50 million to over $1 billion while leading the Large Load Batch Zero process to identify near-term load allocation and recommend transmission projects addressing long-term reliability needs. The position oversees steady-state power flow contingency and congestion management analyses, structures planning studies to evaluate proposed projects, and is responsible for staff hiring, coaching, performance management, and departmental budget oversight. This role coordinates cross-functionally across Planning, Interconnection, and Network Modeling to align Large Load interconnection policy and study standards, and develops new transmission planning techniques, protocols, and procedures to meet evolving system and market needs. Additionally, this position represents ERCOT in technical committees and policy groups such as NERC, engages with stakeholders in forums and working groups, and serves as an expert witness on transmission planning and Large Load integration matters.