Inputs: Notification (e.g. NC, Email…) of a production issue-Logistic kit available at production team & current work order.
Outputs: -Technical analysis & enriched documents for Assembly Anomalies (AM) and Non Conformities (NC) e.g. Concession; -Design Query Note (DQN) including process & equipment issues (disruptions/deviations).
-Rework Work orders-Parachevement work order-Technical information (search for drawings, references, parts, tooling, documentation).
Disruption Management-Daily / on shift line side:
-Support in identifying NC on the shopfloor.
-Support in assessing the need for creating NCs and NC Notifications.
-Support on filling the NC form by providing all relevant information and supporting on solving the NC.
-Support on following up the NC process and push for resolution.
Continuous Improvement-Daily / on shift line side, support for continuous improvement:
-Support on identifying issues in production as well as problems not solvable by the FLM and operators and escalate/request support to the Work Prep (PE), Line Balancing (PPE), Maintenance, MAP & OSW or support function roles.
-Support of the analysis of the industrial systems and processes to assess their efficiency and effectiveness.
-Support on the Work Improvement Proposal (WIP) as well as on the elimination of waste (LEAN).
-Support is given on the process validation form (PVF) and failure analysis (FA).
Industrial Assets-Daily / on shift line side, support on industrial assets:
-Support on the request for repair and the creation of specific requests for small tools.
-Support on writing the specification for the creation of new jigs and tools as well as the modification or improvement of existing jigs and tools and their calibration.
Parachevement-Daily / on shift line side,support on parachevement:
-Support on filling the template for the parachevement as well as.
-Support in assessing the parachevement request with the Multifunctional Team (MFT).
-Support (if not in the same SAP system) in securing that the attested parachevement template will be returned to the requester.
Work order management-Daily / on shift line side, support on work order management:
-Support on flagging blocked work orders so that it can be discussed at the PPC (Production Place Control (in AI))/Level 2 (in ADS) Meeting.
-Further support is given to the Production to prioritize the Execution of the Serial and Rework Work Order if linked to NC, Concession or Blocking Point.
Environment, Health and safety-Daily / on shift line side, support on “EHS”:
-Support on making EH&S rules transparent on the shopfloor.
-Support on ensuring EH&S standards are applied on the station.
-Support on cascading the EH&S requirements to the shopfloor.
-Support on identifying and solving Near Misses.
Quality-Daily / on shift line side, support on “Quality”:
-Support in ensuring that production processes and standards are applied on the station.
-Support in ensuring that quality standards are applied on the station.
Logistics -Daily / on shift line side, support on “Logistics”:
-Support the prioritization of pulling materials related to Rework Work Order to the respective executing station.