1.
To setup derivative test system for product lines based on test specification (PAV) provided by CoC team
accordingly to following requirement:
a. To track project budget and ensure equipment cost within the planed budget.
b. On time delivery of test systems to the production line according to project milestone (include
manage of equipment, hardware interface and mechanical jig and fixture purchase)
c. Release the test system according to Test System Release Procedure.
d. To train and coach maintenance team to be able to handle test system breakdown more
effectively and maintain test system in achieving FOR (NTF related FOR) and OEE target.
(eg. Propose Preventive Maintenance plan, analysis tool of breakdown causes, Test System
Setup guideline and test fixture and job design concept)