This position is located in the Bridge Division under the Hydraulics Section. In this role, you will provide hydrologic and hydraulic analysis and technical support to the Roadway Design Division, Bridge Division, Districts, Consultants hired by the Department, and other State and Federal Agencies, as well as perform bridge hydrologic and hydraulic analysis at bridge sites. You will potentially supervise at least one other engineer and/or a student work study.
Duties include highway project drainage design, drainage studies of existing and future culverts and storm sewer systems, performing hydrologic and hydraulic calculations to properly assess design on State bridges and bridge size structures, inspect structures in the field to assess drainage and hydraulic adequacy, document design requirements in bridge data sheets, guidance and training of all levels of roadway design personnel and consultants, permit review and recommendations, floodplain analysis and certification, wetland studies and design, hydraulic software investigation and support, and development of Section 408 documentation for submittal to USACE for projects impacting levees, dams or other civil works projects. Drainage studies are also performed analyzing existing conditions and conditions that occur after construction, or conditions that are proposed due to development.
This position is expected to review hydrology and hydraulics for projects for designers/engineers when needed, as well as provide training to designers/engineers on the Roadway Design floor related to hydrology and hydraulics.
For project delivery, the most important tasks are related to floodplain analysis and certification of the NDOT highway project and impacts on a floodplain in order to submit a floodplain permit to the floodplain administrator. In addition, a floodplain memo completed by a professionally qualified staff, which is a registered engineer with hydraulics expertise, is required for all NDOT state highway projects to meet FHWA’s regulations for categorical exclusions and location hydraulic studies found in 23 CFR 650.111. The other project delivery components are related to drainage basin delineations, hydrology and flow calculations, culvert and bridge hydraulics, storm sewer design and analysis, stormwater treatment in Municipal Separate Storm Sewer Systems (MS4), detention basins, and energy dissipation.
Other duties include being involved in proposed hydrology and hydraulic research projects and taking part on the Technical Advisory Committee (TAC), as well as developing ideas and general Statements of Need for research proposals. May perform other duties as assigned.