Find jobs
Pricing
Free Resume Checker
Sign in
Sign up
FIND JOBSPRICINGFREE RESUME CHECKERSIGN INSIGN UP
Mars

FI Lead

LocationCHN-Tianjin-Tianjin
Work modeon-site
Typefull-time
SeniorityLead
Company size10,000+ people
First seenOct 5, 2026 · 6d ago
Verified live1d ago
At a glanceSummarised by Seekless from the posting.
Must have13
Understand site area loss and cost/loss linkage, co-work with pillar leaders and MSE manager to achieve
Business cost benefit by driving loss elimination and 3yrs DiB roadmap through FI pillar activities
Build site associates PS (Problem solving) capability to eliminate loss
Collaborate with APAC IE for TJN site capacity bottle neck and capacity expansion
Robust continue improvement culture and lead site level hard-bones solved & KAIZEN projects
Benchmarking KPIs related data and lead site performance review in site management meeting
Co-work with OPS and MAINT Team for OEE, TRS leading and lagging KPIs target setting and governance
Deep dive the opps for site KPIs and find improvement projects
Periodically health check for KPI setting and performance tracking
Safety loss and risk deep diving through collaboration with safety function
Quality loss and defects deep diving through collaboration with Q&FS function
Follow 4M1E to analysis area loss (8 types of waste)
Build projects management system and bring the visibility to all
Job Description:
1.
FI (Focus improvement) management
1.1 Understand site area loss and cost/loss linkage, co-work with pillar leaders and MSE manager to achieve.
1.2 Business cost benefit by driving loss elimination and 3yrs DiB roadmap through FI pillar activities.
1.3 Build site associates PS (Problem solving) capability to eliminate loss.
1.4 Collaborate with APAC IE for TJN site capacity bottle neck and capacity expansion.
1.5 Robust continue improvement culture and lead site level hard- bones solved &KAIZEN projects.
2.
Monitoring Factory Performance, incl. site performance, TRS, DiB, NQC, Productivity, SIG, etc.
2.1 Benchmarking KPIs related data and lead site performance review in site management meeting.
2.2 Co-work with OPS and MAINT. Team for the OEE, TRS leading and lagging KPIs target setting and governance.
2.3 Deep dive the opps for site KPIs and find improvement projects.
2.4 Periodically health check for KPI setting and performance tracking.
3. Deep dive area loss & opportunities and manage all the projects with X-functions
3.1 Safety loss and risk deep diving through collaboration with safety function 3.2 Quality loss and defects deep diving through collaboration with Q&FS function
3.3 Follow 4M1E to analysis area loss (8 types of waste)
**3.**4 Build projects management system and bring the visibility to all
More roles at Mars
Production EngineerCategory Intelligence AnalystTelesales VET - Royal CaninGlobal Sourcing Manager - Business Process Outsourcing (BPO) (f/m/x)Controller- Accelerator
Seekless
Seek less: one search across companies' own career pages, instead of a dozen job boards.
Product
Find jobsCompaniesPricingFree Resume CheckerBlog
Legal
AboutPrivacyTermsCookies
© 2026 SEEKLESS. ALL RIGHTS RESERVED.BUILT WITH CARE