Ensure that the Chief Engineer’s and Chief Mate’s handover notes shall include an environmental component and description of the current status of operation, maintenance, and repair, for the Incinerator, Oily Water Separator, Oil Content Meter, Oil Discharge Monitor, and other pollution prevention procedures or equipment for which they are responsible, the status of spare parts for the aforementioned equipment, and an estimation of the day-to- day bilge loads and accumulations. If a company-specified format for handover notes is used, this shall require descriptive entries as stated above, not solely answers marked as “Yes” or “No”.